Are you sure you want to delete permission of this user ?
This food item already added for that location. Click on yes, if you want to update it.
GURGAON Plot No.16, Sector-18, MIC, Gurgaon -122015, Haryana |
||||||||||||||||||||||||||||||
|
TEST REPORT |
||||||||||||||||||||||||||||||
| Test Name : | (9)A_Leak test Waterproof | Report No : | ||||||||||||||||||||||||||||
| Part Name : | Headlamp Assy, R/L | Model : | Y17 | Applicable STD. : | N/A | |||||||||||||||||||||||||
| Customer Part No. : | 35100/300-71U00 | Test Start Date : | 02-05-2025 | Test End Date : | 02-05-2025 | |||||||||||||||||||||||||
| Test Place : | Inhouse | Sample Qty/No. : | 01 SET | |||||||||||||||||||||||||||
| Part Identification No. : | 25-26/04/104 25-26/04/103 | Test Sample Preserve Date: | - | Test purpose: | ||||||||||||||||||||||||||
|
Equipment/ Instrument Used (Make) |
Instrument ID |
Calibration Validity |
||||||||||||||||||||||||||||
|
Test Specification |
Test Method and Machine/Equipment set up detail |
|||||||||||||||||||||||||||||
| "19.6 kPa (0.2 bar) air pressure applied inside the lamps assemblies and then the lamp assemblies were submerged into water (temperature 18°C). Spec.: Add 19.6 kPa. to the air pressure inside the lamp (about one atmosphere) and submerge the ventilator with it closed. At this time, ventilation hole of lamp must be sealed and bulb socket cover with lamp and so on should be fixed or should be sealed the hole. Water temperature : 18±2°C" |
|
|||||||||||||||||||||||||||||
|
Acceptance Criteria |
Test Observation |
|||||||||||||||||||||||||||||
| There must not be bubbles. There must be dissembled and inspected after all check have been completed and there must be no water instrusion or instrusion mark |
'There was no bubbles from the lamps. There was no water inside the lamps. |
|||||||||||||||||||||||||||||
|
Before Test |
After Test |
|||||||||||||||||||||||||||||
|
Test Results/Conclusion : |
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||